Project Management Answers

Fill in the blank: When describing a SUM function, the _____ is =SUM(value 1 through value 2).

Q: Fill in the blank: When describing a SUM function, the _____ is =SUM(value 1 through value 2).

or

Q: Complete the blank: The _____ in a description of an SUM function is =SUM(value 1 through value 2).

  • Standard
  • Structure
  • script
  • syntax

Explanation: Whenever an SUM function is being described, the structure that is being used is =SUM(value 1 through value 2).

Leave a Reply

Your email address will not be published. Required fields are marked *