Q: As a Product Owner, you need to add estimates to your Backlog items. You and your team have over 100 items to estimate and less than one hour to do it. Because of the time limit, you need a technique that will help your team quickly sort items by complexity. Which effort estimation technique should you use?
or
Q: You must add estimates to the items in your backlog as a product owner. You have less than an hour to estimate more than 100 products with your team. You need a method that will enable your team to swiftly arrange things according to difficulty because of the time constraint. Which method of work estimate should you apply?
- Planning Poker™
- Dot Voting
- The Bucket System
- Affinity Mapping
Explanation: It seems as if you are seeking a method of estimating the amount of work that is both fast and effective in this case. Planning Poker is a method that is often used for this specific goal. It is a strategy that is built on reaching a consensus, and each member of the team utilizes a deck of cards that have numbers on them to signify the level of difficulty or work required in a certain assignment. After going over each topic in depth in conversation, everyone in the group simultaneously chooses a card that corresponds to their estimation. It helps to swiftly classify things and prioritize them based on the team’s consensus assessment, which is a huge time saver. This method is not only effective but it fosters teamwork and encourages members to contribute their ideas.